During the 1 205 day period from August 9, 2021, availability of part.lt was checked 1 times. Out of total assessments led, part.lt was up 1 times, last operable on August 9, 2021, returning a 200 status code. Reports as of November 26, 2024, indicated that part.lt had never experienced periods of inactivity. According to records, no reply with an error status had been received as of November 26, 2024. On August 9, 2021, the recorded response time of part.lt was 0.314 seconds, and the average response time is 0.314 seconds.